Non-functional requirement template

Four mandatory parts and two useful ones. Three filled-in examples: response time, recovery after failure, and log retention.

T.3 Template · updated 2026-10-19

A template for writing a non-functional requirement with four mandatory parts — property, value, conditions, method — and two useful ones: where the number came from, and when it is checked. Why a requirement missing any of the four cannot be checked is covered in the piece on testable non-functional requirements.

Form

NFR           <NFR-NN>  <property and object: “Search response time”>
Property      <what exactly is measured>
Value         <the boundary; for time — percentiles, not the average>
Conditions    <data volume, load, time, type of operation>
Method        <where, with what, from which data>
When          <on staging before release / in production from logs / a drill>
Who           <who checks, and whom they report a violation to>
Source        <current-version measurement / cost of downtime / comparables — assumption?>
Review        <when to come back to the number>

Examples

Performance.

NFR           NFR-03  Catalogue search response time
Property      time from request to server response
Value         95% of requests within 1 s, 99% within 3 s
Conditions    catalogue of 500k items, 200 concurrent users
Method        load test using a profile of a week of real queries
When          on staging before every release; in production — 24 h of logs
Who           load tester; a violation blocks the release
Source        current version measured: 95% — 1.4 s; target — no worse, and faster
Review        when the catalogue reaches 1M items

Availability and recovery. Two numbers set separately: how much data can be lost, and how fast the system must be back.

NFR           NFR-08  Recovery after database server failure
Property      data loss and recovery time
Value         loss — no more than 15 minutes of work;
              recovery — within 2 hours
Conditions    complete failure of the primary server during working hours
Method        drill: restore from backup onto a clean machine
When          once a quarter
Who           operations; report to the product owner
Source        assumption: an hour of downtime ≈ an hour of revenue; confirm with finance
Review        after the drill

Retention. A requirement that cannot be added retroactively.

NFR           NFR-12  Retention of the operator action log
Property      retention period and completeness of records
Value         every change to an order’s status and amount: who, when, was/now;
              kept for 3 years, then deleted
Conditions    all roles allowed to modify orders
Method        sample of 20 changes from last month — all present in the log
When          at acceptance and every six months
Who           analyst and security
Source        contractual obligations to customers
Review        when contract terms change

Notes on the fields

FieldCommon mistakeDone right
ValueAverage timePercentiles: 95% and 99%
ConditionsEmpty — “normal load” is impliedNumbers: volume, users, peak
Method“Check performance”Tool, profile, data source
WhenNot stated — the test is never scheduledA point in the release cycle, or a cadence
SourceA number “off the top of the head” passed off as factWhere it came from; if an assumption, say so

A non-functional requirement with “Method” and “When” filled in becomes an acceptance criterion by itself — there is no need to rewrite it in another format.